For Teknomega, being close to the customer means much more than just providing a product: it means supporting them from the early stages of the project, analyzing needs and constraints together to develop the most suitable solution.
It is from this collaboration that concrete projects are born, in which technical expertise, collaboration, and the ability to customize make the difference.
An example is the recent ground-mounted photovoltaic system from 800 kW built in the Novara area, a project developed together with Leris SpA to respond to two specific design constraints.
Below is the story of the project carried out by our client Leris SpA
No rooftop system. No piling on the ground. The project designed by LERIS for a company in the province of Novara began with two specific instructions. In just two months, those constraints have been transformed into a ground mounted photovoltaic system from 800 kWFor the fastening system, a solution with ballast supplied by Teknomega was chosen.
The project started from two "no"s
For many companies, evaluating photovoltaic systems means starting with the facility's roof. Here, a roof wasn't an option. The client had also ruled out piling the land: two factors that required a different approach than the most straightforward one.
LERIS therefore developed a ground-based solution with ballasted structures. The challenge wasn't simply finding space for the panels, but designing a system capable of meeting the company's needs without affecting the roof, installing poles, or using plinths.
The ballast solution: the work of the two technical offices
To develop the fastening solution, the LERIS Technical Office worked in synergy with Teknomega, a company specializing in ground-mounted photovoltaic solutions. The Teknomega team assisted our Technical Office in developing the system best suited to the site's constraints and supplied the ballast used in the project, sizing the fastening system in an east-west configuration in compliance with Technical Building Regulations.
The solution adopted involves ballasted structures: the system was thus built on the ground without piling or plinths. Discussions between the two technical offices allowed the site constraints to be addressed in the design of the fastening system.
It's a technical detail that makes the difference in the history of this construction site: the land constraint was not circumvented, but addressed in the choice of construction solution.
Despite a slight loss (5-6%) in energy production compared to a classic southern exposure, an east-west system offers the following advantages:
1. High Power Density: Even at just 5°, a vertically arranged panel (2,38 meters long) casts a rear shadow. To avoid mutual shading during the winter months in Novara, the rows at 5° South must be spaced approximately 0,5 meters apart. In the East/West system, the rows are joined in a gabled configuration, requiring only access corridors. For the same power output, the 5° South system requires approximately 20% more space on the ground.
2. Self-consumption: The East/West profile distributes power over two peaks (morning and afternoon), an ideal profile for self-consumption.
3. Inverter Management: Dual-peak power distribution allows multiple panels to be connected to the same inverter (DC/AC overload) without the risk of the inverter cutting off excess power (clipping). With the South 5°, all 1.112 panels reach maximum output at exactly the same time (noon), requiring a higher nominal inverter power (and therefore higher costs).
800 kW produced in two months
The result is an 800 kW ground-mounted photovoltaic system, built in two months. For a business, speed of implementation matters: it shortens the journey between the investment decision and the ability to generate energy for its operations.
The installed capacity, the constraints met, and the completion timeline all contribute to the project's value. This project demonstrates that a customized solution can make an investment viable even when initial options seem limited.
The estimated economic value for the client
According to the project's economic plan, the plant presents the following prospects:
– €160.202 estimated savings on energy costs in the first year;
– 2,86 years estimated payback period;
– 38,02% estimated IRR, the indicator that measures the expected profitability of the operation;
– €0,03/kWh of estimated cost of the energy produced;
– over 6,8 million euros of cumulative net profit estimated over 25 years.
For the company, the expected benefit goes beyond the first-year bill: producing part of the energy it needs also means reducing its exposure to variations in grid purchase prices over time.
Also an environmental benefit
The project's environmental assessment estimates 391 tons of CO₂ avoided each year. This benefit complements the economic one and contributes to the company's sustainability journey.
A concrete response to concrete constraints
This project stemmed from two clear requirements: no roof, no poles. It culminated in an 800 kW ground-mounted system, built in two months and accompanied by a financial plan that quantifies its potential.
This is the crux of the matter: to understand whether photovoltaic is a good fit for a company, you need to start with its consumption, space, and constraints. The right project takes shape from there.
Design and construction: LERIS. Technical support, supply, design, and certification of ballast for the fastening system: Teknomega.
Thanks to the Teknomega technical team for their collaboration and support during the development of the solution.